无标题文档
 您的位置:首页 >>案例 >>建筑设计 >>
 
隆加伯格公司总部大楼

时间:2009-06-09  来源:都市世界  作者:上善若水

 
李铁:被误读的城镇化 2013城市发展与规划大会
2013年4月29-5月5日 张家界城镇体系规划
难题与对策:城镇化的路径选择 长沙天心城市设计
 

有关该大楼的一些数据:

“Offices are situated around a seven-story, 30,000 sq. ft atrium where employees and guests can enjoy the natural daylight from the skylight.

Two basket handles are attached to the building with replica copper and wooden rivets.

The handles are heated to prevent ice from forming.

Two Longaberger tags are attached to the sides of the building. The gold leaf painted tags are 725 lbs each and measure 25′ long x 7′ tall x 3″ thick.

A majority of the cherry woodwork in the building was harvested from Longaberger Golf Club® in Hanover, dried and milled in our Malta facility, sawed and shaped at our Construction Woodshop, finished and installed by our Construction Division.”

Property size: 25 acres

Building capacity: 500 employees

Building footage: 180,000 square feet

Total weight of building: Approximately 9,000 tons

Total weight of handles: Approximately 150 tons

Number of windows: 84

Seven stories in height

192′ long x 126′ wide at grade, widening to 208′ long x 142′ wide at roof

160 times longer, wider and taller than the Medium Market Basket”

 
上一页 页码:[<< 1 ...2 3 4 5 ] 下一页 共5页


打印】 【网站论坛】 【字体: 】 【发表评论】 【关闭
更多关于 隆加伯格公司总部大楼 的资料
· Public Farm One by Work Architecture Company [2008-12-12]
· 国际化肥制造商(Belarusian Potash Company)新总部设计 [2008-12-01]
 
热点专题

资源型城市生态化转型道

进行中的“京津冀一体化

智能交通让城市发展更美

楼房坍塌,“快餐式建筑
行业人物.
学术论文
电子图纸
工程案例
丹佛艺术博物馆住宅
The Museum Residences是由美国著名建筑师Daniel Libeskind设计的。… [详情]
软件下载
考试信息
规划论坛
 
中华人民共和国住房和城乡建设部城乡规划管理中心  指定合作网站   城市发展与规划大会  官方网站
主办:中国城市科学研究会(CSUS)  承办:沃德高科(北京)科技有限公司 新浪微博 腾讯微博 微信 Add to Google
Copyright ©2007-2009 CITYUP.ORG.All Rights Reserved. 
通信地址:住房和城乡建设部北附楼312室(100835)
联系信箱:cityupcityup.org  传真电话:010-88585380
服务热线:010-88585610/11/12转803  QQ:325178919  325178913
版权所有: 都市世界-城市规划与交通网
京ICP备12048982号-3   京公安网备11010802020994号
关闭欢迎关注都市世界微信公众平台!